Page 265 - The Central Motor Vehicles Rules, 1989
P. 265

RULE 115AB      THE CENTRAL MOTOR VEHICLES RULES, 1989               237

                                      (6) The type approval certificate of CNG or Bio-CNG or LNG dual fuel kit for retro-
                                 fitment shall be valid for three years from the date of the issue of type approval certificate
                                 and shall be renewable for three years at a time.]
                                 1



                                  [115AB. Mass emission standards  for  CNG,  Bio-CNG, LNG driven  agriculture
                                     tractors, power tillers, construction equipment vehicles and combine harvesters
                                      (I) For conversion by modification of engines of In-use Diesel Vehicle  115AB
                                        (a) In  case of agriculture tractors, power  tillers, construction  equipment
                                            vehicles and combine harvesters, Type approval for diesel engine retrofitted
                                            for dedicated CNG/ Bio-CNG/LNG operation shall be given for specific
                                            make and model of the vehicle, and shall be approved as per the prevailing
                                            mass emission standards applicable for diesel engines  of  agriculture
                                            tractors, power  tillers, construction  equipment  vehicles and combine
                                            harvesters, with the exception that the HC (Hydrocarbon) shall be replaced
                                            by NMHC (Non-Methane Hydrocarbon) on measurement basis, as detailed
                                            in rule 115AA;
                                        (b) Test for particulate matter and emission of visible pollutants (smoke) under
                                            these rules shall not be applicable;
                                        (c) CNG/Bio-CNG/LNG kit  approved on  the  vehicle for specific engine
                                            capacity can be installed on specific make and model of vehicle and its
                                            variants fitted with the same capacity engine;
                                        (d) The CNG/Bio-CNG/LNG composition used for carrying out emissions
                                            shall meet the fuel specifications as notified by the Central Government
                                            from time to time;
                                        (e) Separate type approval is required  for mechanically controlled  and
                                            electronically controlled diesel Fuel injected vehicles when retrofitted for
                                            CNG /Bio-CNG/LNG operation;
                                        (f) For  retrofitment  on “in-use” vehicles,  the responsibility of the  Type
                                            Approval and COP shall be that of the kit manufacturer or supplier.
                                            Prevailing COP procedure will also be applicable;
                                        (g) The type approval certificate of CNG or Bio-CNG or LNG for replacement
                                            engine shall be valid for three years from the date of the issue of type
                                            approval certificate and shall be renewable for three years at a time;
                                        (h) For the purpose of granting type approval to the agriculture tractor, power
                                            tiller,  construction equipment vehicle/combine  harvester fitted  with
                                            CNG/Bio-CNG/LNG engine (converted from Diesel engine) as O.E. or
                                            retrofitment of In-use diesel vehicle, following performance Tests shall be
                                            carried out as per the table given below by the test agencies, namely:—
                                            Test               Reference Document (as amended from time to time)
                                             (1)                                 (2)
                                  (i) Mass emission test  MoRTH/CMVR/TAP-115/116 and notifications issued
                                                          by the Government of India in this respect from time to
                                                          time


                                 1  Inserted vide GSR 336(E), dt. 4-5-2021, w.e.f. 19-5-2021.
   260   261   262   263   264   265   266   267   268   269   270