Page 802 - The Central Motor Vehicles Rules, 1989
P. 802

774            THE LIQUEFIED PETROLEUM GAS.....ORDER, 2001

                                        E. Fall back arrangement to meet the shortfall in case the tie-up arrangement
                                            does not materialise.
                                      3. Storage and distribution arrangement for auto LPG planned:
                                        A. Details of storage facilities for auto LPG with their capacities.
                                        B. Status of progress on items mentioned above.
                                        C. Plant and equipment/technological details.
                                        D. Details of manpower and the arrangement to handle the product.
                                        E. Details  of designs and  standards to be followed for  construction and
                                            operation of these facilities.
                                         F. Status of approvals for the facilities.
                                      4. Arrangements planned to reach the product to consumption centres/markets:
                                        A. Details of distributor network planned/already appointed.
                                        B. Details of the basis for dealer’s appointment.
                                        C. Details of facilities planned and/or existing for storage and distribution,
                                            showroom/sales room/office along with status of approvals.
                                      5. Product familiarity, training and provision for safety:
                                        A. Operational  knowledge  of product (Liquefied  Petroleum Gas) and  its
                                            handling.
                                        B. The capability and  preparedness to  meet the  safety  requirement in
                                            Liquefied Petroleum Gas, its transportation and accident relief during
                                            transportation.
                                        C. Plans  for  training the staff and the  consumer  on safe handling  of
                                            equipment/product.
                                        D. Recruitment policy and standards for the staff.
                                        E. Familiarity with Gas Control Orders, Explosives Rules and applicable local
                                            Acts.
                                         F. Details of arrangement for handling the emergencies.
                                        G. System for handling/redressal of customer complaint(s).
                                      6. Marketing discipline and guidelines proposed to be adopted:
                                        A. System to monitor and control diversion of auto LPG.
                                      7. Organisation in place/proposed for the parallel marketing of auto LPG:
                                        A. Details of organisation structure.
                                        B. Level of managerial involvement of the promoter.
                                        C. Source of financing the parallel marketing of auto LPG including the
                                            infrastructure.
                                      8. Financial commitment:
                                 Date ..........                                  Signature................................
                                                                                   M/s. .......................................
                                                                                         (Parallel Marketeer)
                                                                                  Address..................................
   797   798   799   800   801   802   803   804   805   806   807