Page 815 - The Central Motor Vehicles Rules, 1989
P. 815
THE C.M.V.R. (ACCREDITATION OF.....BUILDERS) ORDER, 2012 787
Details of manufacturing facility shall be submitted in the following format:—
FORM NO. BBB:02
Sl. No. Facility/equipment/machine Purpose Justification
(iv) Quality control : There shall be established quality system to ensure the
product quality by having control on raw material quality, in-process
quality and final product quality. Quality checks shall be well-defined in
quality document as well as in-process document and well-documented
records of quality checks to demonstrate as evidence and all equipments or
instruments used for quality control shall be calibrated.
Details of quality control facility shall be submitted in the following format:—
FORM NO. BBB:03
Sl. No. Equipment Purpose Calibration Status Justification
(v) Technical competence : There shall be adequate and commensurate
technical manpower having knowledge and adequate experience of bus
body building and manpower having complete knowledge of safety
requirements as stipulated in the Rules. Technical manpower profile and
expertise shall be well-documented and must have knowledge updated
through training from time-to-time.
Details of technical manpower can be maintained and furnished in following
format:—
FORM NO. BBB:04
Sl. No. Manpower details Area of expertise Experience Justification
(vi) Details of Quality System Certification : In case manufacturing plant has
accreditation of Total Quality System (TQS) ISO/IS 16949 or Quality
Management System (QMS) ISO 9001 and other supplementary quality
systems like Environmental Management System (EMS) ISO 14001, the
manufacturer, shall ensure that all safety and environmental legislative
requirements are properly addressed in the quality manual and a copy of
quality manual of such quality system shall be submitted along with the
application.
(vii) Production capability and plan : Every Bus Body Builder shall furnish the
details of installed production capacity, production track record as well as
future production plans.
(viii) Bus Body type approval : Every Bus Body Builder shall furnish the details
of its own or licensed type approval certificates of bus bodies. In case, there
is no type approval certificate available; then future plan can be submitted.