Page 859 - The Central Motor Vehicles Rules, 1989
P. 859

RULE 6     MOTOR VEHICLES (REGISTRATION.....FACILITY) RULES, 2021    831


                                 (e)  The entity shall undertake to obtain the required quality certifications of
                                     ISO 9001(quality management system) or ISO 14001(environmental
                                     certification) or ISO 45001 (occupational health and safety) within twelve
                                     months of commencement of operations as a Registered Vehicle Scrapping
                                     Facility.
                                 (f)  The entity shall possess or provide an undertaking to obtain a consent to
                                     operate from State Pollution Control Board within a period of six months
                                     from commencement of operations.
                                 (g)  The entity shall undertake to abide by the provisions of all applicable
                                     Labour codes and all other Acts or Rules as applicable.
                                 (h)  The entity shall provide evidence of availability of an adequate useable
                                     area of land in the orange category industrial zone of the State or Union
                                     territory by way of ownership or agreement to sell or agreement for lease
                                     of a minimum period of three years.
                                         (i) The entity shall have necessary cyber security certifications
                                            specified under sub-rule (2) of rule 4.
                                        (ii) The entity shall provide approved plant layout and the building
                                            plan.
                          6.   Registration procedure for Registered Vehicle Scrapping Facility
                               (1) An applicant may make an application in the prescribed Form-1, addressed
                          to the Registration Authority of the concerned State Government or Union territory
                          Government where the Registered Vehicle Scrapping Facility is intended to be located
                          along with,—
                                 (i)  a non-refundable processing fee of Rs. 1,00,000/- (Rupees One Lakh only)
                                     for each Registered Vehicle Scrapping Facility proposed to be established;
                                     and
                                 (ii)  an earnest money deposit by way of a bank guarantee of Rs.
                                     10,00,000/- (Rupees Ten Lakhs) for each Registered Vehicle Scrapping
                                     Facility proposed to be established, in favour of the Registration Authority
                                     or as a non-interest-bearing security deposit for a period, co-terminus with
                                     the validity of the initial registration period, plus ninety days.
                               (2) All applications for grant of registration shall be disposed of by the Registration
                          Authority within a period of sixty days from the date of application.
                               (3) All accepted applications shall be issued a registration certificate in
                          Form-1A.
                               (4) Applicants whose applications are rejected shall be refunded their earnest
                          money or bank guarantee.
                               (5) The Central Government shall develop a portal for Single Window Clearance
                          on which the applicant will apply with all necessary documents and required fee for
                          registration.
                               (6) State Government or Union territory Government shall clear the proposal in
                          time bound manner within sixty days including the internal approval from various
                          State agencies (Labour, Pollution, etc.) after submitting such application else the proposal
                          would be deemed approved.
   854   855   856   857   858   859   860   861   862   863   864